Skip to main content
Thomas Harder Company Logo
Thomas Harder Company Logo

Tule Subbasin SGMA Support

Hydrogeological Conceptual Model and Water Budget for the Tule Subbasin

Lower Tule River Irrigation District/Tule Subbasin MOU Group (2014 – 2017)

Tule SubbasinProject Approach TH&Co has been providing technical support to assess the hydrogeological condition, water balance, and sustainable yield of the Tule Subbasin. A comprehensive water budget was estimated for the time period between 1987 and 2013 through:
  1. Analysis of changes in groundwater storage based on spatially distributed groundwater level changes and aquifer specific yield estimates; and
  2. Development of a detailed groundwater budget for the entire subbasin that described and estimated the sources of groundwater recharge and discharge.
Both methods required a detailed analysis of the geology, hydrology and hydrogeology of the Tule Subbasin as a whole. For the groundwater budget, TH&Co conducted an extensive analysis of historical surface flow and infiltration losses along the Tule River from Tule River Association and agency reports. Project Results TH&Co has prepared a preliminary groundwater flow model of the Tule Subbasin for use in verifying the subsurface inflow and outflow for the water budget. TH&Co is currently outlining a process to further develop the numerical groundwater flow model of the basin for use in refining the groundwater budget and providing groundwater management guidance for SGMA compliance.
© Copyright - 2026 | Thomas Harder & Company, Inc. All Rights Reserved | CALL NOW: (714) 779-3875
website design by Cal Coast Web Design